Uzbekistan · formwork rental and sales
TAMINOT — helping you buildRequest a quote ↗

TAMINOT24 · UZBEKISTAN

PERI TRIO wall formwork rental

Panel formwork for concrete walls in Tashkent and Uzbekistan. Provide the geometry and rental period so we can agree the configuration and availability for your project.

PERI TRIO panels, corners and push-pull props
PERI image. The actual configuration is agreed in the quotation.

Which structures TRIO is used for

Framed panels form the faces of concrete walls. Selection takes account of wall lengths and heights, corners, openings and the casting sequence. Columns and shafts require suitable system elements; availability and variants must be confirmed separately.

TRIO is a PERI system designation. State it in your enquiry and provide a layout if extending an existing set. Compatibility is checked against documentation, not just the visual similarity of panels.

What to include in a wall formwork enquiry

ElementsWhat to specify
Straight and corner panelsWall heights, section lengths, corners and openings
Panel clampsPanel connection and extension layout; TRIO uses the BFD alignment coupler
Tie rods, nuts and push-pull propsWall thickness, tie and bracing layout
Column and shaft elementsCross-section, height and required variant; availability on enquiry

Preparing information for a rental quote

  1. Attach floor plans and sections with dimensions.
  2. Mark the sections to be cast simultaneously.
  3. Specify wall heights, thicknesses, openings and junctions.
  4. Provide the city, start date and planned rental duration.

Wall area and two-sided formwork area are different measurements. Attach drawings and explain what your stated area represents. Rental terms, supplied equipment and pricing are agreed in the quotation.

Can I rent part of a set?

List only the panels and accessories you need. Attach the existing system specification so sizes and connections can be agreed. Availability is checked for the required dates.

Why is there no single price per square metre?

Rental cost depends on equipment configuration, quantity, duration and agreed handover terms. When comparing quotes, check whether clamps, tie rods, nuts, push-pull props and logistics are included.

Need foundation formwork?

Send foundation sections, heights and widths, plus the casting plan. Our specialists will check panel suitability and connecting elements. A system name alone cannot define the set: dimensions, bracing and work sequence must be agreed from the drawings.

How rental costs are calculated and what the quote includes →

TRIO system on the PERI website ↗